PRACTICAL ADDITION TO THE OUTDOOR SHOWER

It is November 4, and we still are using the new outdoor shower.  Or Glenn is.  I have run into logistical problems.  OK, so Glenn has no hair.  I do.  We both have to shave in the shower, Glenn less than me ( he has to get rid of the odd late bloomer).  Glenn does not have to shampoo.  So, women do more stuff in the shower than men, most of the time.

Mud is created in the new gardens around the shower when it is on.  I cannot sit in mud and tend to my legs.  It just seems so wrong.   And we need a way to store shower stuff outside so it cannot be seen.

An old Mexican made window pot placed under the bench will do a great job containing and hiding shower stuff.

Of course, tile will have to be put on bench, maybe words this time?  And see the blank area on the shower bottom next to the bench? That is a perfect cement plane and tile can be added there too.  Visually the bench and that part of the shower bottom could interact.
In the first picture above, the papyrus and ginger lilies transplanted earlier this summer are doing well, but are only a shadow of what they will be.  The ginger lilies are blooming!  They never had before; they were in another garden and had too much shade for their needs.  I already cannot wait for spring to come.

Advertisements

PROGRESS ON THE SHOWER

Here is a picture of the element used to partition our shower off from the shower entry area, the one which makes having a shower door unnecessary.  The base of the structure is a couple of two by fours, and they are covered with cement board. All seams are taped and imbedded in thin set.

Likewise all seams on the walls of the shower are taped with thin set applied.  Then the application sat for a day.

Yesterday plans for the design of the shower came more firmly into view.  Of course, it has to be made out of tile and etc that is on hand, so I started pulling out possibilities.

At this point everything in the new bathroom and bedroom is very neutral,  except for the paint by numbers paintings in the water closet, but that door can be closed.

Below is part of the alcove where the urinal posing as a sink is located.

From this area which is defined by a wall of glass windows, you can access shower, sink and water closet.

The neutral setting of the bedroom.  To the left around these closets is the bathroom.

Below are candidates for the shower bottom.  I am going to use the off white porcelain and save the brown for something else.  The orange and blue will help create figures on the shower wall, in a real departure from all the neutrals.

As soon as I saw the conformation of the shower at the beginning of construction, I could not get Matisse‘s “La Danse” out of my mind.  I want to take this idea, and create a circle of simplified nudes, maybe with cubist faces.

This is so interesting.  There are two versions of Matisse’s famous work.  The one we as Westerners know the best is the less intense version.  This one came first.  The second version, with more detail and more intensity came second.

The version above was done for a Russian businessman, and it stayed in his home in Moscow until 1917.  Later it found its way into the Hermitage.  I wonder if this version is less known to us because of where it lived and the Cold War.