CONSTRUCTION WORKER INTERFACE

Yesterday I was required to do a short succinct job to keep the other construction workers working on our bedroom addition.   This  is a very big deal if you are the customer of construction workers.  Any wrinkle in any plan can put you way behind.  I am sure these guys love this:  my husband just rips things out and redoes their work on the weekend, and after they leave EARLY on Friday.  I tell him to let me know when they drive up Monday morning because to be elsewhere is my choice for that scene!

First of all, the  workers laid down this cement board on the plywood flooring without using thin set and not using the prescribed amount of screws, which is six inches apart around the perimeter and eight inches apart within.  Knowing they were wrong, I took up the cement board.  I relaid it with thin set and also took care of the seam between the two pieces of cement board with a plastic grid and more thin set under and over it. The wood you see will also be covered with cement board, and it is the boundary for the shower, which is behind it, to the right.

Today they were going to build shelving for the bathroom, and one of those units will rest on this tiled area.  That was the reason for the hurry.  So the above picture shows the area, about four by five that had to be re-boarded, and then tiled yesterday, and grouted this morning before the workers arrived.  Grout is pretty forgiving after about a half hour.

I first thought I would use some fine tiles that a friend had found on the street and presented to me at just the right time, almost as if the universe were offering them.  They proved not to be such a good choice.  Part of the bunch was porcelain and we don’t have a wet saw.  Rummaging around, these remnants from my husband’s former house came to the top of the mix.  They are typical white four by fours almost exclusively used in bathrooms.  When I looked at these, and then at our urinal/basin, they were great together.  Very industrial looking, and the rest of the bathroom will work in concert.

Having the right tools to cut this tile, which is organized in groups of sixteen with latex in between, it was an easy job to  tailor the tiles to fit my space.  After the workers left for the day, I applied another layer of thin set and laid the tile.

Here is the finished job, yet ungrouted.  The darker lines are the only ones that will take the grout.  I didn’t even have to rush this morning to finish the job.  I can grout later after the shelves are finished.

I broke many rules when laying this tile, but sometimes you have to.  It is like making art:  there are rules, and they need to be followed by the inexperienced.  BUT sometimes you have to intelligently create some new rules and follow them for the best outcome.  The dark area in the foreground is our pecan flooring.  The merging of these two surfaces has to be perfect, and perfectly aligned.  Normally, one starts to lay tile in the middle of a floor, and works out to the walls, leaving partial tiles that have to be cut near the walls.  Here, like the perfect middle of a big tiled floor, the perfect part has to be that union of wood and tile.  So I started the laying on that edge.  And since the construction is very square, the edge to the right fell into place as well.  The cut tiles are to the left and the back edges, and they will be covered by shelf and baseboard.  Some time you can get away with stuff!

Advertisements

2 thoughts on “CONSTRUCTION WORKER INTERFACE

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s